10. Adjustment by hand of the ORION 4
For any adjustment or installation work at the wire stitching machine ORION 4 ,
the drive unit can be moved by hand. For this step use the pipe spanner 19 mm 2
Attention!
Before all repairs, disconnect the power supply and set safety switch (main switch)
to „0".
First remove the plug 1 . Put the double offset ring wrench 2 on the hexagon 3 of
the motor shaft and turn the pipe spanner 2 in direction of arrow 4 .
Important!
Before resumption of work the pipe spanner 2 has to be removed from the hexagon
of the motor shaft.
Hohner Maschinenbau GmbH – ORION 4
- 13 -