Wiring Diagram; Wiring Method - Panasonic FV-10VEC2R Installation And Operating Instructions Manual

Energy recovery ventilator
Hide thumbs Also See for FV-10VEC2R:
Table of Contents

Advertisement

WIRING DIAGRAM

WIRING METHOD

Note
(1)The HVAC/AHU signal cord, wall switch cord, boost switch cord, wall switch and
boost switch are not supplied.
(2)The terminal of wall switch has been connected by jumper cable for factory default.
(3) If a wall switch is not used to power down the ERV note that cutting power by
unplugging the unit, and/or opening the frame cover to maintenance, will disallow
the unit to run a power down process; leaving the dampers in the open position.
This could increase the risk of cold air infiltration which may lead to frost forming in
the ERV.
(4) If you do not intend to run the product for more than 24 hours we recommend you
connect product with a wall switch to control the standby and running of the product.
6
Jumper cable

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents