Cable Installation - Nvidia Spectrum SN2000 Hardware User Manual

10/25/40/50/100gbe open ethernet switch systems
Table of Contents

Advertisement

Standard Installation:
Middle rack Installation:
The 2-post mounting installation may cause sinking of the switch. The rear end sag is
6-8mm. 
4.
The cable retainer should be used to secure the cable when installing the system. To secure
the power cord inside the retainer, press the small tab on the retainer strip to loosen the
loop.

Cable Installation

All cables can be inserted or removed with the unit powered on.
To insert a cable, press the connector into the port receptacle until the connector is firmly seated.
The LED indicator, corresponding to each data port, will light when the physical connection is
established. When a logical connection is made, the relevant port LED will turn on.
To remove a cable, disengage the locks and slowly pull the connector away from the port
receptacle. The LED indicator for that port will turn off when the cable is unseated.
For full cabling guidelines, ask your NVIDIA representative for a copy of NVIDIA Cable Management
Guidelines and FAQs Application Note.
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn2700Sn2740Sn2410Sn2201Sn2100Sn2010

Table of Contents