Removing The System From The Rack - Nvidia Spectrum SN2000 Hardware User Manual

10/25/40/50/100gbe open ethernet switch systems
Table of Contents

Advertisement

While your installation partner is supporting the system's weight, perform the following
steps:
5.
Mount the system into the rack enclosure, and attach the brackets installed on the system to
the rack's posts. Secure the brackets to the rack's posts by inserting four M6 screws in the
designated cage nuts, as described in the figure below. Do not tighten the screws yet.
Attaching the Brackets to the Rack
6.
Slide the two blades into the left and right rails, and adjust them to fit your rack's depth. Use
four M6 screws (D) to fix the blades into the rack. Do not tighten the screws yet.  
Sliding the Blades in the Rails
7.
Secure the system in the rack by tightening the 8 screws inserted in Step 5 and Step 6 with a
torque of 4.5±0.5 Nm.

Removing the System from the Rack

To remove a unit from the rack:
1.
Turn off the system and disconnect it from peripherals and from the electrical outlet.
While your installation partner is supporting the system's weight:
2.
Loosen the screws attaching the brackets to the rack. Do not remove them yet.
3.
Loosen the screws attaching the blades to the rack, and pull the blades towards you, while
your partner is holding the system.
4.
Extract the loosened screws from Step 2 and dismount the system from the rack.
5.
Remove the rails and brackets from the chassis by unscrewing 8 screws. 
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn2700Sn2740Sn2410Sn2201Sn2100Sn2010

Table of Contents