Installation; Before Installation; Installation Parts - Miele PUR 98 D Operating And Installation Instructions

Ventilation system
Table of Contents

Advertisement

Before installation

Before installation, it is important
to read the information contained in
this chapter and in the "IMPORTANT
SAFETY INSTRUCTIONS" chapter.
Information is subject to change. Please
refer to our website to obtain the most
current product specification, technical
& warranty information.

Installation parts

4 screws, 7 x 110 mm and
4 plugs 10 x 80 mm
for securing the ventilation system to
the ceiling (not for use in USA / CDN).
The screws and plugs are designed
for use in solid ceilings only.
Use different fasteners for other
construction types. Make sure that
the ceiling can support the load.
4 telescopic extension piece holders
for aligning and securing the telescopic
extension piece
4 screws, M4 x 8.5 mm
for securing the telescopic extension
piece holders.
14 screws, M4 x 8 mm
for securing the spacer frame and
securing the ventilation system to the
installation frame.
1 screw, M4 x 16 mm
for securing the chimney.
1 non-return flap
for fitting into the exhaust socket on
the motor unit (not needed for
recirculation mode). Depending on the
model, the non-return flap may already
be mounted.
DUI 32 conversion kit for
recirculation mode
(not supplied, available as an optional
accessory). The kit contains a
directional unit socket and flexible
aluminum hose with hose clips.
Keep the following in a safe place:
1 lever
for replacing the bulbs.

Installation

23

Advertisement

Table of Contents
loading

Table of Contents