Unit Location - Master MWC Series Installation And Operation Manual

Ultraviolet sterilizers
Table of Contents

Advertisement

A complete water test is recommended to determine if pre-treatment
equipment is required before installation of the UV unit. Water must
meet criteria below:
Contaminant
Chloride
Color
Hardness
Iron
Manganese
pH
Total Dissolved Solids (TDS)
Turbidity
If untreated water quality exceeds the maximum allowable levels
specified, this will result in bacteria passing through the UV unit
and into the piping system.

Unit Location:

1. The MWC-ES unit must be installed after the well tank and any
water pre-treatment equipment (softeners, filter, etc.). You must
install a Cartridge type Dirt Filter before the MWC-ES unit to
eliminate the possibility of a dirt build-up inside the stainless
steel sterilization chamber. (SEE PAGE 2, PIPING LAYOUT )
2. Install at least 4 feet from a dedicated electrical outlet.
DO NOT INSTALL NEAR ANY HEATING SYSTEMS WHICH
RAISE THE AIR TEMPERATURE OVER 100 DEGREES.
MWC-ES 304 Electro Polished SS Vessel Installation:
1. The ultraviolet unit is designed to be installed in a vertical position.
The unit is supplied with (2) brackets to support the unit.
NOTE: The upper bracket has a grounding lug attached to it.
2. Place the top bracket (larger one) over the nipple located at the
Maximum Allowable Level
250 ppm
None
8 gpg
0.3 ppm
0.05 ppm
Range between 6 and 8.5
500 ppm
3
5 ntu

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mwc-es seriesMwc-es7Mwc-es10Mwc-es20

Table of Contents