Product specifications
5. Run Connect Device to connect the set with the PC.
The connection is completed when the green light is
turned on and the connected message is displayed as
shown below. (Within 10 seconds)
In case of connection failure, click the Options
button to check which equipment is the problem and
reconnect.
6. Select the service option (panel replacement or
main board replacement) and UI and report issuing
language. Enter the monitor model name and SN.
7. If you select to replace the panel, select the file with
the Calibration Setting value entered.
8. When Start Calibration is executed, Calibration is
executed. (2 ~ 3 minutes).
2-16