Start Up Check Of The Puncture Guide Tube; Visual Check; Mechanical Inspection; Mounting Of Rubber Boot - Hitachi UST-676P Instruction Manual

Transrectum puncture electronic convex probe
Table of Contents

Advertisement

MN1-5029 Rev.22

3-2. Start up check of the puncture guide tube

3-2-1. Visual check

Make sure the puncture guide tube is not in the abnormal condition listed below.
Visual abnormalities such as deformation, cracking, abnormal gaps, damage, foreign matter adhering,
clogged induction tube, sever discoloration.
The holding clip can not close until the end.
Loosened screws which fix the holding clip.
A spring of the holding clip is damaged.

3-2-2. Mechanical inspection

Check the puncture guide tube mechanism while attached to the probe.
The screws have no looseness, backlash, immobility, or other abnormalities.
The puncture guide tube is firmly attached to the probe.
There are no tears in the rubber boot.

3-2-3. Mounting of rubber boot

Cover the probe insertion portion with the rubber boot to prevent infection and then attach the puncture
guide tube over this.

3-2-4. Verification of operation

When puncturing under the ultrasonic guide, for safety reason, it is also recommended that you have a
full understanding of ultrasound diagnostic characteristics and conduct practice beforehand using a tub
or similar object.
-20-

Advertisement

Table of Contents
loading

Table of Contents