Installing The Operator - CAME STYLO Series Installation Manual

External automation for swing gates
Hide thumbs Also See for STYLO Series:
Table of Contents

Advertisement

Installing the operator

The following illustrations are only examples, given that the space for securing the automation and accessories varies depending
on the overall dimensions.
Set up corrugated tubes for the connections coming from the junction box.
N.B.: the number of tubes depends on the type of system installed and any accessories.
Connection junction box.
STYLO-BS
1a) Trace all axis and dimensions, the secure the gearmotor anchoring bracket to the wall or post as well as the arm-to-gate anchoring bracket.
Note: the illustrations are mere examples, it is up to the installer to choose the most suitable solution depending on gate-leaf type and thickness.
56
4 x ø 8,5
80
2 x ø 6,5
60
100

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stylo-me

Table of Contents