3.5.

Inspecting the Cabinet

Once the cabinet has been unpacked, a preliminary visual inspection must be
performed before it is unloaded from the shipping pallet.
C007
C007:
Pre­equipped rack cabinet:
If the inspection indicates an unacceptable safety condition, the
condition must be corrected before powering on the system and/or
devices inside the rack cabinet.
Required Tools
None
Procedure
1. Check that the delivery is compliant with the Purchase Order.
2. Check that the boxes labeled Open Me First and Unpacking Box contain
the stabilizer and skate-board assemblies.
3. Check covers and doors for sharp edges, damage or alterations.
4. Check the correct fit of covers and doors.
5. Open the front and rear doors.
Note Unlock the front door with the key, pull the handle forwards and
6. Check for internal damage, alterations and obvious safety hazards such as
broken wires, sharp edges, or broken insulation.
7. Check internal cables for damage.
8. Check for dirt, water, and any other form of contamination inside the
cabinet.
9. Check the voltage label on the back of the cabinet to ensure that it matches
the voltage at the power outlet.
10. Carefully check the electrical specifications on the safety labels at the back
of the cabinet.
CAUTION
upwards to disengage the lock.
Chapter 3.
Installing the Rack Cabinet
3-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

M3s2g8M3ux16

Table of Contents