3.1.
General Recommendations
Important The Data Processing Site manager must allocate enough
Cabinets may be delivered either equipped with servers and devices or empty,
according to the model chosen.
Site preparation must be completed by the pre-arranged delivery date.
Any delay due to non-completion of the site by the pre-arranged date will be
considered as the Customer's responsibility.
Note R@ck'n Roll Cabinet 1200 unpacking and depalletizing instructions are
D008
D008:
The loaded cabinet is extremely heavy and will require the use of an
elevator.
It is mandatory for the loaded cabinet to be transported vertically, as
indicated on the packing.
Important The Data Processing Site manager must set aside the
See
3-2
Installation and Service Guide
personnel to ensure safe handling.
clearly set out on a label attached to the front door of the cabinet.
DANGER
required working area for unpacking.
2.1. Service Clearance, on page 2-1 for more information.