Eaton 93E Generation 2 UPS 100-200 kVA
(380/400/415V)
Figure 21. Blocking the space between the cable and cabinet
1
Space to be blocked with fireproof mud
5.3
5.3.1
To install wiring:
1.
Make sure that the UPS system is turned off and all power sources are
removed. See Chapter
2.
To locate the appropriate terminals and review the cabling and termination
requirements, see Section
3.
Route the interface cables to the UPS via the right side panel or the
knockout at the top (front right corner) of the cabinet.
4.
Connect the signal input interface cabling as shown in Table
23
.
5.
If you are cabling parallel connections, proceed to Section
cabling MiniSlot connections, proceed to Section
©
Eaton Corporation plc 2019. All rights reserved.

Installing interface connections

Installing signal input connections

7
for shutdown instructions.
4.3.3
14
, Table
Revision: 002
Document ID: P-164000848
User's and installation guide
22
, Figure
and Figure
14
5.3.2
5.3.3
.
23
.
and Figure
. If you are
62 (118)