Connecting The System Control Box (Hidden Installation) - ViewSonic LDP216-121 User Manual

4k uhd all-in-one direct view led display
Hide thumbs Also See for LDP216-121:
Table of Contents

Advertisement

Connecting the System Control Box (Hidden Installation)

1. Carefully unfold the System Control Box panel. Ensure the main system control
board is on the right.
NOTE:  Use caution as the System Control Box panel is separated into two pieces
with wires attached.
2. Install the left and right part of System Control Box using the M6x16mm screws
behind the Cabinet.
NOTE:  The System Control Box can be installed on the left or right side behind
the display.
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vs18889

Table of Contents