About The Documentation; About This Document; Installer Reference Guide At A Glance; About The Box - Daikin RXM20R5V1B Installer's Reference Manual

Table of Contents

Advertisement

CAUTION
▪ When connecting the power supply: connect the earth
cable
first,
before
connections.
▪ When disconnecting the power supply: disconnect the
current-carrying cables first, before separating the earth
connection.
▪ The length of the conductors between the power supply
stress relief and the terminal block itself must be as
such that the current-carrying wires are tautened before
the earth wire is in case the power supply is pulled
loose from the stress relief.
NOTICE
Precautions when laying power wiring:
▪ Do NOT connect wiring of different thicknesses to the
power terminal block (slack in the power wiring may
cause abnormal heat).
▪ When connecting wiring which is the same thickness,
do as shown in the figure above.
▪ For wiring, use the designated power wire and connect
firmly, then secure to prevent outside pressure being
exerted on the terminal board.
▪ Use an appropriate screwdriver for tightening the
terminal screws. A screwdriver with a small head will
damage the head and make proper tightening
impossible.
▪ Over-tightening the terminal screws may break them.
WARNING
▪ After finishing the electrical work, confirm that each
electrical component and terminal inside the electrical
components box is connected securely.
▪ Make sure all covers are closed before starting up the
unit.
NOTICE
Only applicable if the power supply is three‑phase, and the
compressor has an ON/OFF starting method.
If there exists the possibility of reversed phase after a
momentary black out and the power goes on and off while
the product is operating, attach a reversed phase
protection circuit locally. Running the product in reversed
phase can break the compressor and other parts.
2

About the documentation

2.1

About this document

INFORMATION
Make sure that the user has the printed documentation and
ask him/her to keep it for future reference.
Target audience
Authorised installers
Documentation set
This document is part of a documentation set. The complete set
consists of:
ARXM25+35R5V1B RXM20~35R5V1B
R32 Split Series
4P519439-8H – 2020.07
making
the
current-carrying
2 About the documentation
▪ General safety precautions:
▪ Safety instructions that you MUST read before installing
▪ Format: Paper (in the box of the outdoor unit)
▪ Outdoor unit installation manual:
▪ Installation instructions
▪ Format: Paper (in the box of the outdoor unit)
▪ Installer reference guide:
▪ Preparation of the installation, reference data,...
▪ Format: Digital files on
http://www.daikineurope.com/support-
and-manuals/product-information/
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages
are translations.
Technical engineering data
▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
Business Portal (authentication required).
2.2
Installer reference guide at a
glance
Chapter
General safety
Safety instructions that you MUST read
precautions
before installing
About the documentation
What documentation exists for the
installer

About the box

How to unpack the units and remove
their accessories
About the unit
How to identify the unit
Preparation
What to do and know before going
on‑site
Installation
What to do and know to install the
system
Commissioning
What to do and know to commission the
system after it is configured
Hand‑over to the user
What to give and explain to the user
Maintenance and service
How to maintain and service the units
Troubleshooting
What to do in case of problems
Disposal
How to dispose of the system
Technical data
Specifications of the system
Glossary
Definition of terms
3
About the box
3.1

Overview: About the box

This chapter describes what you have to do after the boxes with the
outdoor and indoor unit are delivered on-site.
Keep the following in mind:
▪ At delivery, the unit MUST be checked for damage. Any damage
MUST be reported immediately to the claims agent of the carrier.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
▪ When handling the unit, take into account the following:
Description
Installer reference guide
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents