SECTION 5: SERVICE PROCEDURES
RACK RAIL STABILIZER KIT
First, remove three bolts, locknuts and flat washers at middle hood/tub junction.
Next, remove door splash shield.
Then, install new door splash shield using the three bolts, locknuts and flat washers.
Rack Rail Stabilizer
05700-011-34-63
AJ-54C Series Technical Manual 7610-002-30-91
Issued: 03-22-2006 Revised: N/A
45