Cisco Meraki Go GR12 Installation Manual page 8

Table of Contents

Advertisement

filled with workspaces divided by mid-height cubicle walls, installing on the ceiling or high on a wall would be ideal.
2. Power over Ethernet supports a maximum cable length of 300 ft (100 m).
3. If being used in a mesh deployment, the GR12 should have line of sight to at least two other Meraki devices. A
Cisco Partner can help ensure that your AP placement is ideal.
Mount the GR12
Attach the GR12 to the Mount Cradle
The GR12 attaches to the mount cradle with two tabs on the cradle that insert into the GR12, and is secured to the cradle using one screw.
To attach the GR12 to the mount cradle properly, line up the top edge of the AP with the top tab of the mount cradle. Since the cradle is already mounted to the
wall, guide the GR12 towards the top tab and insert the top tab into the GR12's slot.
Then adjust the GR12 to guide the GR12's bottom slot into the cradle's bottom tab until it clicks into place. Once in place, the GR12 should be secured to the
cradle by using one of the included screws in the cradle's bottom tab.
8

Advertisement

Table of Contents
loading

Table of Contents