6 Stop Running, Dismantle, Discard Inverter

6.2 Dismantle the Inverter

After the connection among inverter and grid and PV string is completely disconnected and wait for
20mins at least, ensure that the inner capacitor discharge completely and check that there is no
voltage and current in the inverter by the detection equipment, and then the inverter can be
dismantled.
Step 1
Disconnect all connection successively in reversed procedures of 3.5 Electrical Connection.
Step 2
Dismantle the inverter in reversed procedures of 3.4 Inverter Installation.
Step 3
If the inverter will be installed and used in the future, please dismantle the installation holder on the
wall or bracket, then pack and store the inverter properly. (see 7.1 Package and 7.3 Storage).
----End

6.3 Discard the Inverter

For the inverter that will not to be used, user needs to discard the inverter according to related
provision.
The battery, module and other components inside the inverter may pollute the environment, please do
corresponding dispose on the basis of related provision.
40
PV Grid-tied Inverter SPI-B X2 Series (8K-25K)
All rights reserved ©Xiamen Kehua Digital Energy
User Manual
Tech Co., Ltd.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents