The inverter is rated at IP66. Avoid installing the inverter under sunshine.
Installing the inverter under sunshine or rain or snow will affect the inverter lifespan and efficiency.
Installing the inverter under shade is best, as shown in Figure3-2.
The installation height of the inverter should be convenient for viewing the indicator status.
Figure3-2 Recommended installation site

3.2.3 Installation Clearance

Keep a clearance of at least 300mm from the front of the inverter to other objects, at least 250mm
from the left side and right side of the inverter to other objects, at least 350mm from the top of the
inverter to ceiling and at least 600mm from the bottom of the inverter to ground, which is good for
heat dissipation or maintenance, as shown in Figure3-3.
Figure3-3 Installation clearance (unit: mm)