Installation Method; Transportation And Unpacking; Transportation; Unpacking And Checking - KEHUA TECH SPI-B X2 Series User Manual

Pv grid-tied inverter
Hide thumbs Also See for SPI-B X2 Series:
Table of Contents

Advertisement

3 Installation

3.2.4 Installation Method

Figure3-4 Installation method

3.3 Transportation and Unpacking

3.3.1 Transportation

The inverter should be transported by trained professional.
During transporting, please take care and avoid impacting or dropping.
During transporting, keep the inverter vertically, do not put it down or put it up suddenly.

3.3.2 Unpacking and Checking

Select the unpacking site in advance. In principle, the unpacking site should be as close to the
installation site as possible.
The inverter has been tested and checked strictly, but it still may be damaged during transporting, so,
please check it carefully.
 Inspect the inverter's appearance, if any shipping damage is found, report it to the carrier
immediately.
 Check if the type of the accessories are complete and correct. If there is any discrepancy, take
notes and contact the distributor or local dealer immediately.
14
PV Grid-tied Inverter SPI-B X2 Series (8K-25K)
All rights reserved ©Xiamen Kehua Digital Energy
User Manual
Tech Co., Ltd.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents