3.2.2 Installation Environment

The installation environment of inverter should meet the following items:
 Do not install the inverter in the place with poor ventilation.
 There has sufficient fresh-air supply around the inverter.
 The installation place has no direct sunlight and rain.
 Place select the wall or bracket with enough bearing capacity.
 Consider the visibility of operation panel.

3.2.3 Installation Clearance

Keep a clearance of at least 1000mm from the left side and right side of inverter to other objects, at
least 500mm from the top of inverter to ceiling and at least 500mm from the bottom of inverter to
ground, which is good for heat dissipation or maintenance, as shown in Figure3-2.
Figure3-2 Installation clearance

3.3 Handling, Unpacking and Checking

3.3.1 Handling

The inverter should be handled to the installation site by trained professionals(at least two person).
14
SPI-B Series (30K-60K) String PV Grid-tied Inverter
All rights reserved ©Kehua Hengsheng Co., Ltd.
User Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spi30k-bSpi33k-bSpi36k-bSpi40k-bSpi50k-bSpi60k-b

Table of Contents