Reception - Rinnai EHP-HS190M-IN2 User's And Installer's Manual

Inverter air/water heat pumps
Table of Contents

Advertisement

4 4 R R E E C C E E P P T T I I O O N N

5. RECEPTION

Before accepting the delivery you have to check:
that the unit hasn't been damaged during transport.
Check that the materials delivered correspond with that
indicated on the transport document comparing the data with
the identification label 'A A ' positioned on the packaging.
In case of damage or anomaly:
Write down on the transport document the damage you found
and quote this sentence: "Conditional acceptance clear
evidence of deficiencies/damages during transport".
Contact supplier and the carrier by fax and registered mail
with advice of receipt.
Any disputes must be made within the 8 days following the
delivery. Complaints after this period are invalid.
S S t t o o r r a a g g e e
Shelter from: direct sunlight, rain, sand and wind.
Stocking temperature:
maximum 50°C
minimum -10°C
The respect of the instructions on the exterior side of the
packaging assures the physical and functional integrity of the
unit for the final user's advantage.
H H a a n n d d l l i i n n g g
Before handling verify that the unit keeps its balance.
The following examples are indications the choice of the means
and of the handling modes will depend on factors.
1 Verify unit weight and handling equipment lifting capacity .
2 Identify critical points during handling (disconnected routes,
flights, steps, doors).
3 Stair climbing trolley.
4 Use protection (A) to avoid the unit damaging
5 Belt input side for lifting (B) by crane
6 Fork input side the
 It is strictly forbidden to stand under the machine when it is
lifted.
N N O O T T E E
N N O O T T E E
D D A A N N G G E E R R
1 1
?
2 2
3 3
4 4
A
5 5
A
6 6
Reception
B
27

Advertisement

Table of Contents
loading

Table of Contents