3 Replacement of Main Parts
The necessary adjustments after the replacement of each part, and the referential time for each work are
described as follows.
TOOL CARRIAGE REPLACEMENT : 10min.
1. TOOL HEIGHT ADJUSTMENT
2. TOOL PRESSURE ADJUSTMENT
3. AUTO TOOL/CROP MARK SENSOR POSITION
ADJUSTMENT
< Total Time : 65min. >
MAIN BOARD REPLACEMENT : 10min.
1. FIRMWARE INSTALLATION
2. ALL INITIALIZE
3. TOOL PRESSURE ADJUSTMENT
4. CALIBRATION
5. AUTO TOOL/CROP MARK SENSOR POSITION
ADJUSTMENT
< Total Time : 70min. >
CARRIAGE MOTOR REPLACEMENT : 5min.
1. AGING
< Total Time : 6min. >
GRIT MOTOR REPLACEMENT : 5min.
1. AGING
< Total Time : 6min. >
3-1 TOOL CARRIAGE_REPLACEMENT
Remove the TOP COVER and TOP PANEL.
Remove the TOOL CARRIAGE COVER.
PINCH ROLLER REPLACEMENT : 5min.
CUTTER PROTECTION REPLACEMENT : 5min.
Adj. Time : 55min.
Adj. Time : 60min.
Adj. Time : 1min.
Adj. Time : 1min.
3-1
< Total Time : 5min. >
< Total Time : 5min. >
TOP PANEL
TOP COVER
TOOL CARRIAGE COVER