Download Print this page

Operation - Master RB16 Operation Manual

Portable rebar bender

Advertisement

6.Before plugging in,make sure that the switch lock is OFF.
WARM-UP
In cold weather,warm up unit for 30~60 seconds so that the
hydraulic oil reaches the proper viscosity.Pull trigger-switch to
extend piston and release when it has reached its full stroke.Repeat
15~20 times.
POINTS OF ATTENTION
Do not cover air vents.
1.
CARE: If events are covered,motor will overheat and may burn
out. 2.If hydraulic oil exceeds 70.( (158.F) in temperature,
power will drop.
Allow unit to cool before resuming operation.(Be particularly
careful in summer, when the aluminum pump case heats up
quicker.)
3.If a drop in power is observed and motor is unusually hot, check
carbon-Brushes.

OPERATION

The NRB-32 is primarily intended to straighten deformed rebar. It
can or course , also be used to bend straight rebar.
To enable the unit to be used in confined spaces, there are two
8

Advertisement

loading

This manual is also suitable for:

Rb25Rb32Rb32bNrb-32Nrb-25Nrb-22