Download Print this page

Kohler K-3399 Installation Manual page 9

One-piece toilet
Hide thumbs Also See for K-3399:

Advertisement

Available languages

Available languages

Screw
Pull Wall Box Wires Through
Liquid Tight Conduit
5. Make the Final Electrical Connections
NOTICE: An electrician should make the final electrical connections
using wire nuts or other terminations as required by applicable local
codes. Connect the black wire to the line, the white wire to neutral,
and the green wire to ground.
Cut the liquid-tight, flexible conduit to a length suitable to make
a connection to the wall box.
Assemble the connectors on the conduit.
Pull the wall box wires through the conduit to the junction box
mounted on the rear inside wall of the toilet tank.
Connect the conduit at both ends.
Using the appropriate terminations, make the electrical
connections in the junction box on the toilet tank.
Install the junction box cover using the self-tapping screws
provided.
Kohler Co.
Junction Box Cover
Junction Box
Liquid Tight Conduit
9
1021800-2-B

Advertisement

loading