Optimal Installation Diagram - Beko CLEARPOINT V 80 Installation And Operation Manual

Activated carbon tower
Table of Contents

Advertisement

4.3
Optimal Installation Diagram
Number
1
Air Compressor
2
After Cooler
3
CLEARPOINT® Inline Water Separator
4
CLEARPOINT® 5.0 micron (Grade G) Filtration
5
Receiver Tank
6
CLEARPOINT® 1.0 micron (Grade F) Filtration
7
DRYPOINT® XCp Desiccant Dryer (Shown with CLEARPOINT® Pre and Post-Filtration
8
CLEARPOINT® 0.01 micron (GradeF) Filtration
9
Condensate Drainage Points for BEKOMAT®
10
CLEARPOINT® V Activated Carbon Tower
11
Dry Air Outlet
Optimal installation is with moderately sized receivers at the inlet and outlet side of the dryer and carbon
tower. This allows for the additional free cooling and moisture collection as well as a more consistent dry-
er inlet flow provided by an upstream receiver while providing the most reliable shop air supply due to the
downstream receiver.
Under no circumstances should the peak demand air flow exceed the maximum rated air flow of each system
component.