Bosch rexroth SE 2/C Series Assembly Instructions Manual page 83

Table of Contents

Advertisement

9.
Hold the end of the
chain vertically and
insert the sliding piece
into the return head.
10.
Drag the chain in the
top guide profi le to the
drive head.
11.
Place the chain on the
drive wheel.
12.
Rotate the drive wheels
in the conveying
direction until the
chain appears on the
chain tensioner.
13.
Install the drive and
return head covers.
14.
Use the disassembly
tool to remove so many
excessive chain links that
you can close the chain
as closely as possible to
the tensioning wheel.
15.
Lubricate the new
4
chain lock
) and close
the chain.
4
) Chain lock:
– For fl at top chain:
3 842 535 333
– For accumulation roller
chain: 3 842 530 417
16.
Loosen the mount of the
chain tensioner.
Check the tension of
the chain.
17.
Mount the outer halves
of the protective case.
18.
Install the gear motor.
8
14 15
BS 2/C-...
3 842 535 333
3 842 530 417
2x
18
SW10
M = 5 Nm
D
AS 2/C-100
AS 2/R-300
AS 4/R-300
Changing the conveyor chain AS 2/C-100, ...-250, AS 2/R-300, ...-700, MA = R/L (2/2)
Maintenance and repair
9
13
SW4
M
= 2,5 Nm
D
8
1
)
4
)
14 15
2
)
4
)
AS 2/C-250
AS 2/R-700
AS 4/R-700
3 842 358 737/2022-08, MIT: SE 2/C-..., SE 2/R-..., Bosch Rexroth AG
83/108
SW4
M
= 2,5 Nm
D
10
11
12
16
SW19
17
4x
18
SW10
M = 5 Nm
D
358 736-48
13

Advertisement

Table of Contents
loading

Table of Contents