Bosch rexroth SE 2/C Series Assembly Instructions Manual page 44

Table of Contents

Advertisement

44/108
Assembly
5.
Hold the drive train (A)
over the drive heads.
6.
Guide the chain over
the drive wheels through
the drive head down
to the chain tensioner.
7.
Insert the drive train into
the drive heads.
8.
Lift the chain slightly
and insert the sliding
piece (F) into the
drive head.
9.
Install the drive and
return head covers.
10.
Use the disassembly
3
tool
) to remove as many
excessive chain links
as required so that you
can close the chain as
closely as possible to
the tensioning wheel.
3
) Disassembly tool:
– For fl at top chain:
3 842 010 510
– For accumulation roller
chain: 3 842 010 511
4
) Chain lock:
– For fl at top chain:
3 842 535 333
– For accumulation roller
chain: 3 842 530 417
11.
Lubricate the new chain
lock and close the chain.
12.
Loosen the mount of the
chain tensioner.
Check the tension of
the chain.
13.
Mount the outer halves of
the protective case.
Bosch Rexroth AG, MIT: SE 2/C-..., SE 2/R-..., 3 842 358 737/2022-08
6
SW4
M
= 2,5 Nm
D
13
3
)
8 981 010 511
AS 2/R–...
10
11
2
3 842 530 417
AS 2/C–...
10
11
3
)
8 981 010 510
Fig. 31:
AS 2/C-100, ...-250, AS 2/R-300, ...-700, MA = M: Assembling the conveyor chain (2/2)
5
7
9
12
8
)
4
)
4
3 842 535 333
)
12
13
358 736-33

Advertisement

Table of Contents
loading

Table of Contents