On/ Off - KEHUA TECH SPI-B Series User Manual

String pv grid-tied inverter
Hide thumbs Also See for SPI-B Series:
Table of Contents

Advertisement

4 Operation Interface
Button

4.3.5 ON/ OFF

In the main interface, press " " button to enter the main menu. In the main menu, press "▼" button
four times and then press " " button to enter the ON/OFF interface. When the inverter is off, it will
enter the power on confirmation interface. While the inverter is on, it will enter the power off
confirmation interface, as shown Figure4-53 to Figure4-54, the relevant button function is as shown
in Table4-11.
Figure4-53 Power on confirmation interface
Figure4-54 Power off confirmation interface
54
Function
Choose downward
Number "-"
Enter the next level
Confirm the selection
Select number bit in the selection box
Long press to save
SPI-B Series (30K-60K) String PV Grid-tied Inverter
All rights reserved ©Kehua Hengsheng Co., Ltd.
User Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spi30k-bSpi33k-bSpi36k-bSpi40k-bSpi50k-bSpi60k-b

Table of Contents