4 Operation Interface
This chapter mainly introduces the operation interface of inverter.
4.1 Initial Wizard
If it's the first time to power on LCD, it will enter the initial wizard. It can set the language, date &
time, screen, as shown in Figure4-1 to Figure4-4, the relevant button function is as shown inTable4-1.
If it has to set the above parameters later, set them in the setting interface(refers to 4.3.4 Setting).
Figure4-1 Initial wizard interface
Figure4-2 Language setting interface
32
4 Operation Interface
SPI-B Series (30K-60K) String PV Grid-tied Inverter
All rights reserved ©Kehua Hengsheng Co., Ltd.
User Manual