Ac Connection - KEHUA TECH SPI-B Series User Manual

String pv grid-tied inverter
Hide thumbs Also See for SPI-B Series:
Table of Contents

Advertisement

3 Installation
Step 5
Insert the positive wire and negative wire into the corresponding insulation crust respectively. If there
has a click sound, it means it have been inserted properly.
Step 6
Tighten the sealing nuts of positive connector and negative connector to the corresponding insulation
crusts respectively.
Step 7
Insert the positive connector and negative connector into the ports marked with "+" and "-" in the
inverter respectively. If there has a click sound, it means it have been inserted properly, as shown in
Figure3-18 and Figure3-19.
Figure3-18 Connect with the positive pole of DC input
Figure3-19 Connect with the negative pole of DC input.
----End

3.5.3 AC Connection

When wiring, pay attention to distinguish the AC live wire, neutral wire and grounding wire.
Step 1
Dismantle cover, as shown in Figure3-20.
24
SPI-B Series (30K-60K) String PV Grid-tied Inverter
All rights reserved ©Kehua Hengsheng Co., Ltd.
User Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spi30k-bSpi33k-bSpi36k-bSpi40k-bSpi50k-bSpi60k-b

Table of Contents