Cut And Plan Views; Installation; Location; Uncrating The Stand - Hussmann Q1-DC Installation And Operation Manual

Deli service case
Hide thumbs Also See for Q1-DC:
Table of Contents

Advertisement

rev. 0508
11"
Q1-DC
Single Deck Deli - Curved Glass
Scale = 1/2"

location

The refrigerated merchandisers have been designed for
use only in air conditioned stores where temperature and
humidity are maintained at or below 75°F and 55% relative
humidity. DO NOT allow air conditioning, electric fans, ovens,
open doors or windows (etc.) to create air currents around
the merchandiser, as this will impair its correct operation.
Product temperature should always be maintained at a
constant and proper temperature. This means that from the
time the product is received, through storage, preparation
and display, the temperature of the product must be
controlled to maximize life of the product.

Uncrating the Stand

Place the fixture as close to its permanent position as
possible. Keep in place, attached case until ready to set/bolt
to adjoining case.

Tighten Glass Screws

Tighten screws along clamshell located on the underside
of glass before placing unit into operation.

exterior loading

These models have not been structurally designed to
support excessive external loading. Do not walk on their
tops; This could cause serious personal injury and damage
to the fixture.

Setting and Joining

The sectional construction of these models enable them to be
joined in line to give the effect of one continuous display.
An Alignment pin kit is supplied with every case and must
be used in alignment.

leveling

iMPOrTaNT! iT iS iMPeraTive THaT caSeS Be
leveleD FrOM FrONT TO BacK aND SiDe TO SiDe
PriOr TO JOiNiNG. a level caSe iS NeceSSarY
TO iNSUre PrOPer OPeraTiON, WaTer DraiNaGe,
GlaSS aliGNMeNT, aND OPeraTiON OF THe HiNGeS
SUPPOrTiNG THe GlaSS. leveliNG THe caSe
cOrrecTlY Will SOlve all HiNGe OPeraTiON
aND GlaSS PrOBleMS.
6 7/8"
35"
29 3/8"
4 3/8"
45"

cut and Plan views

Drain 5" from
Center LIne
9 1/2"
STRAIGHT
DRAIN
REF.
DROP
4 3/8"
45° O/S
Straight plan view with
Inside and Outside Wedges

installation

NOTE:
A. To avoid removing concrete flooring, begin lineup
leveling from the highest point of the store floor.
B. When wedges are involved in a lineup, set them first.
All cases were leveled and joined prior to shipment to
insure the closest possible fit when cases are joined in
the field. When joining, use a carpenters level and adjust
legs accordingly. The legs on the Q1-DC are adjustable
and do not require shims. Simply screw the leg up or down
to adjust height.
1. Using case blueprints, measure off and mark on the
floor the exact dimensions of where the cases will
sit. Snap chalk line for front and back positions of
base rail or pedestal. Mark the location of each joint
front and back. Find the highest point throughout the
lineup. FlOOrS are NOrMallY NOT level!
Determine the highest point of the floor; cases will
be set off this point. All cases in the entire lineup
must be brought up to the highest level of the case
sitting at the highest point in the lineup. This may be
done a few different ways.
a) Walk the floor looking for any mounds or dips.
b) Use a string level.
c) Use a transit.
If a wedge is used in the middle of a lineup, the
wedge must be set on the highest point on the floor
FIRST, with the rest if the lineup being leveled from
it. The Q1-DC case has adjustable legs to allow for
leveling.
2. Set first case over the highest part of the floor and
adjust legs so that case is level. Remove side and
back leg braces after case is set and joined.
3. Set second case within one foot (1') of the first case,
and remove leg skids. Keep the supports along the
length of the case and far end of case. Level case to
the first using the instructions in step one.
4. Apply masking tape 1/8" in from end of case on
inside and outside rear mullion and body work on
both cases to be joined.
3
C L
4'
45° I/S
6 1/8"
DRAIN
REF.
DROP
48"
Plan View
Scale = 1/2"
DRAIN
6 1/4"

Advertisement

Table of Contents
loading

Table of Contents