Sample Protocol™ Checklist - Hussmann Proto-Aire Installation Manual

Hussmann proto-aire: install guide
Table of Contents

Advertisement

Store: Joe's Market
Date: 6/7/2004
Unit
Model Number
Serial Number
Factory Order Number
Manufacture Date
Defrost
Circuit NO.
Type
No./Day
Length
Superheat
Suction Set Point
Suction Pressure
Suction Temperature
Split/Satellite Superheat
Suction Set Point
Suction Pressure
Suction Temperature
Oil
Turba-Shed
Pressure Differential
Condenser
Head Pressure
Water Temperature In
Water Temperature Out
Refrigerant
Receiver Level
Liquid Sight Glass
Compressor No.
Model No.
Discharge Temperature
Amp Draw
Shell Temp at Oil Connect hot
Float or Oil Connect
Oil Control Magnet Cond.
Controller
Alarms
Time & Date Displayed
Notes: L.L. Filter changed
All valves adjusted. 4 PEXH4s, 2 C-store Reach Ins, 1 ND5 would not adjust
Removed T-stats from PEXH4s, ND5s, and DM.
Raised suction S.P. from 48 psig to 52 psig. All PEXH4s cleaned. 1-2 inches of slime grew there
Sample
Protocol™ Checklist
Location: Anytown, USA
Time:
K
PH06PK-MEMEMEMEMEMF
06542
08/31/98
1
2
3
Off
Off
Off
4
3
3
40m 45m
45m
42°
52 psig
52.0 psig / 17°F Saturated
59 °
POE
Between Glasses
214.9 psig
OK
OK
404a
Foamy
1
2
ZF13K4
ZH13K2
173
166
10.2
10.7
hot
¾
full
118
Protocol™ Installation and
Service Manual
4
5
6
Off
Off
Off
2
1
3
45m 60m
45m
3
4
ZH13K2
ZH13K2
166
165
10.8
11.2
warm
warm
7/8
3/4
7
8
5
6
ZF13K4
ZF15K4
162
165
10.2
12.5
warm
warm
1/2
full

Advertisement

Table of Contents
loading

This manual is also suitable for:

Protocol

Table of Contents