Vibration Pads - Hussmann Proto-Aire Installation Manual

Hussmann proto-aire: install guide
Table of Contents

Advertisement

Protocol™ Installation and
Service Manual
Rigging and Hoisting
The installer is responsible for ensuring that the equipment used to move the Protocol™ is
operated within its limits. Under no circumstances should the top of the unit or the outer
panels be used for lifting or moving the unit. For strap rigging, run the straps under the top
level of compressor mounting channel.

Vibration Pads

Vibration Isolation Pads are supplied with each Protocol™ unit. To adjust for slightly
uneven floors, place 16 gauge galvanized steel shims between the vibration pads and the
floor (shims must be field supplied). One vibration pad is installed under each upright
channel. Vertical units use four pads. Horizontal units use 8 to 10 pads.
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Protocol

Table of Contents