Carrier AGAGC9PNS01D Installation Instructions Manual page 12

Gas conversion kit, propane to natural condensing (90%+) furnaces 40,000 btuh to 140,000 btuh models only
Table of Contents

Advertisement

AGAGC9PNS01D Gas Conversion Kit, Propane to Natural: Installation Instructions
Two-Stage Gas Valve
COMMUNICATION
CONTINUOUS FAN
CONNECTOR
(CF) AIRFLOW
SETUP SWITCHES
MODEL PLUG
CONNECTOR
SW1 SETUP
SWITCHES AND
BLOWER OFF-
DELAY
AIR CONDITIONING
(A/C) AIRFLOW
SETUP SWITCHES
24-V THERMOSTAT
TERMINALS
STATUS AND COMM
LED LIGHTS
3-AMP FUSE
TRANSFORMER 24-VAC
CONNECTIONS
115-VAC (L2) NEUTRAL
CONNECTIONS
PART NUMBER AND
PL1 – LOW VOLTAGE MAIN
DATE CODE WWYY
HARNESS CONNECTOR
AND ECM BLOWER
SOFTWARE
HARNESS CONNECTOR
VERSION
Representative drawing only, some models may vary in appearance.
MODEL PLUG
SW1 SETUP
OUTDOOR
CONNECTOR
SWITCHES AND
AIR TEMP
BLOWER OFF-
CONNECTOR
DELAY
COMMUNICATION
CONNECTOR
24-V THERMOSTAT
TERMINALS
STATUS AND COMM
LED LIGHTS
PL1 – LOW VOLTAGE MAIN
HARNESS CONNECTOR
3-AMP FUSE
TRANSFORMER 24-VAC
CONNECTIONS
115-VAC (L2) NEUTRAL
CONNECTIONS
115-VAC (L1) LINE
VOLTAGE CONNECTIONS
Representative drawing only, some models may vary in appearance.
Representative drawing only, some models may vary in appearance.
Fig. 21 – Example of Two-Stage Speed Furnace Control for VCA or
VCT Blower Motor
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
OUTDOOR
SW4 SETUP
AIR TEMP
SWITCHES
CONNECTOR
HUMIDIFIER
TERMINAL (24-VAC
0.5 AMP MAX.
FLASH
UPGRADE
CONNECTOR
(FACTORY
ONLY)
115-VAC (L1) LINE
PL2 – HOT SURFACE
VOLTAGE CONNECTIONS
IGNITER & INDUCER
MOTOR CONNECTOR
EAC-1 TERMINAL
(115-VAC 1.0 AMP MAX.)
AIR CONDITIONING (A/C) &
HUMIDIFIER
CONTINUOUS FAN (CF)
TERMINAL (24-VAC
AIRFLOW SETUP SWITCHES
0.5 AMP MAX.)
ACRDJ – AIR
CONDITIONING
RELAY DISABLE
JUMPER
FLASH
UPGRADE
CONNECTOR
(FACTORY
ONLY)
PL2 – HOT SURFACE
SOFTWARE
EAC-1 TERMINAL
IGNITER & INDUCER
VERSION
(115-VAC 1.0 AMP MAX.)
MOTOR CONNECTOR
A221035A
1. Enable two-stage thermostat on control board by:
a. For boards with DIP switches, turn SW1-2 on furnace control
ON, see
Fig.
b. For boards with 3 digit display, navigate to (Htt) and select
(2st), see
Fig.
instructions.
2. Jumper R-W/W1 and R-W2 thermostat connections on control.
3. When main burners ignite, confirm inlet gas pressure is between
4.5-in. w.c. and 13.6-in. w.c.
4. Remove jumper across R-W/W1 and R-W2 thermostat connections
to terminate call for heat.
5. Turn furnace gas valve switch to OFF position.
6. Turn gas supply manual shutoff valve to OFF position.
7. Turn off furnace power supply.
8. Remove manometer and on some models remove pressure tap
fitting.
9. On some models, apply pipe dope sparingly to the end of inlet gas
pipe plug and install into unused end of 1/8-in. (3 mm) tee. Use a
small back-up wrench on tee when tightening gas inlet pipe plug.
Or, on some models, tighten set screw on inlet tower pressure tap
A200178
with a 3/32-in. hex wrench, see
Fixed Speed Blower (FCT), Two-Stage Gas Valve
Representative drawing only, some models may vary in appearance.
L14F003
24-V THERMOSTAT
TERMINALS
3-AMP FUSE
LED OPERATION
& DIAGNOSTIC LIGHT
BLOWER SPEED
TERMINALS
115-VAC (L2)
NEUTRAL
CONNECTIONS
Representative drawing only, some models may vary in appearance.
Fig. 22 – Example of PSC or Discrete Tap Two-Stage Furnace
12
21.
21. See furnace installation manual for additional
Fig. 13
or
Fig.
SET UP SWITCHES
THERMOSTAT TYPE (TT)
AND HEAT OFF--DELAY
TWINNING AND/OR
COMPONENT TEST
TERMINAL
TT
OFF
DLY
24--V THERMOS TAT
TERMINALS
TEST / TWIN
HUM
24VAC
FUSE 3- - AMP
3--AMP FUSE
COM/BLUE 24VAC/RED
LED OPERATION
& DIAGNOSTIC LIGHT
COM
115 VA C
BLOWER POWER (BL1)
HI HT
CONNECTION
BLOWER SPEED
COOL
TERMINALS
LO H T
SPARE 2
EAC TERMINAL
SPARE 1
115 VAC 1.0 AMP
EAC- - 2
MAX
EAC- - 1
115--VAC (L2)
NEUTRAL
CONNECTIONS
L1
115 VAC LINE (L1)
SET UP SWITCHES
LOW HEAT ONLY
AND BLOWER
OFF-DELAY
TWINNING AND/OR
COMPONENT TEST
TERMINAL
LHT
OFF
DLY
ACRDJ - AIR CONDITIONING
RELAY DISABLE JUMPER
TEST / TWIN
HUMIDIFIER TERMINAL
HUM
(24 VAC 0.5 AMPS MAX)
TRANSFORMER
24 VAC CONNECTIONS
PL1-LOW VO LTAGE
FUSE 3-AMP
MAIN HARNESS CONNEC TOR
SEC-2
SEC-1
COM
24VAC
COM
115 VAC
BLOWER POWER (BL1)
HI HT
CONNECTION
COOL
LO HT
SPARE 2
EAC TERMINAL
115 VAC 1.0 AMP MAX
SPARE 1
EAC-2
EAC-1
L1
BL-1
PR-1
115 VAC LINE (L1)
INPUT
Control
14.
HUMIDIFIER TERMINAL
(24 VAC 0.5 AMPS MAX)
TRANSFORMER
24 VAC CONNECTIONS
P--1 LOW VOLTAGE
115 VA C
TRANSFORMER
PRIMARY
P2 -- HOT SURFACE
IGNITER/INDUCE R
MOTOR CONNECTION
BL- -1 XFMR
HUM
HSI
HI
LO
115 VAC HUM
A200177
115 VAC
TRANSFORMER
PRIMARY
PL2 - HOT SURFACE
IGNITER/INDUCE R
MOTOR CONNECTION
HSI
HI LO
A200176

Advertisement

Table of Contents
loading

Table of Contents