JBL VTX Series Rigging Manual page 39

Hide thumbs Also See for VTX Series:
Table of Contents

Advertisement

STEPS:
After the two front QRPs have been secured, keep lowering the flown array until the rear two connection points come together.
1
Once touching, insert to two rear QRPs to secure the two clusters together. If the angle of the flown cluster is too steep (too
much down angle) and the rear connection points are too far apart, follow the steps shown below to safely connect the clusters
together.
VTX A8 | Rigging Manual
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vtx a8Vtx a8 afVtx a8 af ebVtx a8 sbVtx a8 vt

Table of Contents