Preparations Before Installation - Panasonic Urban Multi Series Installation Manual

Hide thumbs Also See for Urban Multi Series:
Table of Contents

Advertisement

∗≥30
(2) Use suspension bolts for installation. Check whether the ceiling is strong enough to support the
weight of the unit or not. If there is a risk, reinforce the ceiling before installing the unit.
(Installation pitch is marked on the paper pattern for installation. Refer to it to check for points requiring
reinforcing.)
(3) This indoor unit may be installed on ceilings up to 3.5 m in height. However, if the ceiling is higher
than 2.7m, the remote control will have to be set locally. (Refer to "10. FIELD SETTING" on page 16)

4. PREPARATIONS BEFORE INSTALLATION

(1) Relative positions of indoor unit, suspension bolt, piping hole, drain piping hole, and electric wire
hole position. (Refer to Fig. 2)
F
Front view
Left side piping hole
Model
CS-32TMJPL
CS-63TMJPL
CS-100TMJPL
5
∗≥30
Required service
space
G
Rear side piping hole
(φ 100 )
Fig. 2
A
B
960
920
1160
1120
1400
1360
Air outlet
Air inlet
Obstruction
Floor
Fig. 1
A (Decoration panel)
B (Suspension bolt pitch)
False ceiling view
Air outlet
C
D
390
375
310
490
475
410
610
595
530
2500 or higher
from the floor
For installation
in high places
(Length : mm)
C
D
E
Top side drain
piping hole
Top gas piping hole
Suspension
bolt ( 4)
Top liquid hole
(Length : mm)
E
F
G
400
375
500
475
620
595
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-32tmjplCs-63tmjplCs-100tmjpl

Table of Contents