Preparations Before Installation - Panasonic CS-20PM1HPK Installation Manual

Packaged air conditioner
Table of Contents

Advertisement

CS-∗∗PM1HPK
Window
100 or
Front side
more
(PM1HPK)
1000 or
more

4. PREPARATIONS BEFORE INSTALLATION

(1) Positioning of holes for fastening to the wall
(2) How to open / close the front panel
1. Open the lid of controll panel (both left and right)
2. Remove screws (both left and right)
that lock the knobs in position.
3. Push the knobs (both left and right) to the rear.
4. Lift the front of the top plate.
5. Lower the front panel towards the front of the unit.
• To close, perform the procedure in opposite order. Pull
towards the front unit the knob snaps in place.
5
Air flow direction
1750 or
100 or
more
more
(PM1HPK)
150 or
Air inlet
direction
more
(RM1HPK)
Base
A
(IMPORTANT) Leave sufficient clearance for air inlet
and maintenance.
Model
CS-20 · 25PM1HPK
CS-20 · 25RM1HPK
CS-32 · 40PM1HPK
CS-32 · 40RM1HPK
CS-50 · 63PM1HPK
CS-50 · 63RM1HPK
Model
CS-20 · 25PM1HPK
CS-20 · 25RM1HPK
CS-32 · 40PM1HPK
CS-32 · 40RM1HPK
CS-50 · 63PM1HPK
CS-50 · 63RM1HPK
1
2
3
CS-∗∗RM1HPK
Maintenance
area
A (mm)
B (mm)
570
1030
710
1170
990
1450
A (mm)
590
730
1010
2
4
3
4
5
English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents