BT CARGO GT 15 Operator's Manual page 60

Table of Contents

Advertisement

Inspection Period
operating hours or month, whichever is soonest)
Power steering
5. Oil leakage
6. Mounting and linkage looseness
7. Power steering hose damage
Knuckle
8. King pin looseness
9. Cracking and deformation
BRAKING SYSTEM
Brake pedal
1. Play and reserve
2. Braking effect
Parking brake
3. Operating force
4. Braking effect
5. Linkage and cable looseness and damage
Brake pipe and hose
6. Leakage, damage and mounting condition
Brake oil
7. Level
Master cylinder or wheel cylinder
8. Function, war, damage and mounting looseness
Brake drum and brake shoe
9. Clearance between drum and lining
10. Shoe sliding portion and lining wear
11. Drum wear and damage
12. Shoe operating condition
13. Anchor pin rusting
14. Return spring wear, etc.
15. Automatic adjusting function operation
Backing plate
16. Deformation cracking and damage
17. Mounting looseness
LOAD HANDLING SYSTEM
Forks
1. Fork and stopper pin condition
2. Left and right fork uniformity
3. Cracks in fork base and welded portion
Periodic Maintenance
(Accomplish based on
© BT Industries AB 180424-040
EVERY
1
3
EVERY
170
500
I
I
I
M
I
I
I
I
I
I
M
I
I
60
6
12
Months
1000
2000
Hours
I
I
I
I
I
I
I
M
I
I
T
3
I*

Advertisement

Table of Contents
loading

Table of Contents