Pioneer DEH-M8047ZT/UC Service Manual page 103

Table of Contents

Advertisement

5
- Clamp actions
1. When an 8 or 12cm disc is placed on the center of the spindle, the detection arm starts moving.
2. The movement of the detection arm engages the loading rack with the 2-stage gear.
3. The clamp lever slides to lower the clamp arm. At this time, the roller up arm rotates to separate the roller arm
from the disc. The roller arm moves the mech lock lever and turns the mech lock arm to release the mech lock. At
the position where the clamp switch is turned off, the clamp operation ends.
4. After the clamp operation, the clamp lever moves to rotate the gear lock arm. The planet gear separates from the 2-
stage gear to get engaged with the pickup feed screw's gear. Then the carriage operation will start.
Feed Screw's Gear
5
Planet Gear
Mech Lock Lever
- Eject actions
1. Eject actions start when the Pickup is fed to the position inner than "Home SW ON" point in the internal circumfer-
ence of the circle, caused by backward rotation of the Load Carriage Motor. Eject actions follow the foregoing proce-
dures (steps taken in loading, centering and clamping actions), but each action in those steps is performed in
reversed manner.
2. In case of 12cm-disc, Eject is completed when SW3 completes its condition- transition of OFF → ON → OFF.
3. For 8cm-disc, Eject is completed when SW2 completes its condition-transition of OFF → ON → OFF.
5
6
Clamp Lever
3
Loading Rack
2
2-Stage Gear
6
7
Gear Lock Arm
4
4
Clamp SW
Roller Up Arm
6
7
Detection Arm
1
1
1
Mech Lock Arm
CX-3057
7
8
A
B
C
Roller Arm
D
E
F
21
8

Advertisement

Table of Contents
loading

Table of Contents