Adjust Blend Valve - Pentair EZ-RO 200/2G-BL Installation & Operation Manual

Hide thumbs Also See for EZ-RO 200/2G-BL:
Table of Contents

Advertisement

SYSTEM DUMP AND FILL, CONNECT TO EQUIPMENT (CONTINUED)

ADJUST BLEND VALVE

Follow steps 7 through 11 to adjust blend valve to
optimize water to mineral levels per customer's
specifications.
7. Shut off tank valve.
8. Open outlet valve. Water needs to be flowing in order
for the TDS meter to function.
9. Review TDS levels from digital TDS meter. TDS is
measured in ppm or parts per million.
10. Adjust mineral content with the blend valve.
+ To increase mineral content, turn knob counter-
clockwise (lefty loosey).
-To decrease mineral content, turn knob clockwise
(righty tighty).
Monitor consistency when set.
11. Close outlet valve.
12. Open tank valve.
CONNECT TO EQUIPMENT
13. Connect end of outlet tubing to water line to
equipment using the 1/2" NPT by 1/2" push to connect
fitting or other appropriate fitting.
14. Open outlet valve on RO processor until it is pointing
up to allow optimized water to enter equipment.
• Water will begin to enter equipment.
• Complete final check for leaks.
System install and flushing complete.
Treated water is now in use at equipment.
NOTE: The blended water tubing/piping and associated
fittings connecting the RO blended water outlet to
the equipment being serviced should be food-grade
material that meets NSF® Standard 51, 61, or similar,
with a minimum pressure rating of 100 psi (6.9 bar,
0.69 MPa). The RO/blended water may react with
metal piping, creating a corrosive condition in addition
to imparting an objectionable taste. Plastic pipe or
reinforced beverage tubing are generally very good
material choices for RO water distribution piping. The
size of the blended water tubing/piping should be 1/2-
inch (12.7 mm) O.D. minimum.
PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE
closed
closed
7
7
9
11
13
8
10
open
open
12
14
FOODSERVICE.PENTAIR.COM | 15