Setting In Site - Haier AU302CHBAA Installation Instructions Manual

Outdoor unit
Table of Contents

Advertisement

Installation procedure
After installation,please fill in the following form for easy daily maintenance:
No.
1
2
3
4
Check for installation and test run
Please operate the air conditioner according to the operation manual.
Check items for test run, put mark "
Gas leakage from pipe connection?
Heat insulation treatment of pipe connection?
Are the connection wiring of indoor and outdoor unit firmly inserted into the terminal block?
Is the connection wiring of indoor and outdoor firmly fixed?
Is drainage securely arranged?
Is the ground wire securely and firmly connected?
Is power supply voltage abided by electric code?
Is there any noise?
Does cooling perform normally?
Does room temperature regulator operate normally?
Model of indoor unit
Factory No. of unit
"
in
"
".
17

Setting in site

Advertisement

Table of Contents
loading

Table of Contents