6. Equipment Installation

Follow rigorously below instructions:
1- Remove the equipment from its box and verify for any possible damages, caused by the
transportation.
2- Install the controller in a strategic place, of ease access and operation, free of vibrations and
vapors.
3- Avoid direct exposure of the controller to solar rays and in case if necessary, protect the controller.
4- Proceed with terminal connections of cables at terminal barr.
5- Inspect the electrical installation in order to certify that all connections are correct.
6- Verify the power that is being supplied and make sure to connect it the proper place.
7- Connect the circuit breakers from the power distribution box.
3.1. Important Recommendations
3.1.1. The equipment
so, the power cable of Control Valves, Solenoids, Alarms, etc, must be connected directly at the
Distribution Box, and "
3.1.2.
Verify
if the equipment
This proceeding is a must in order to preserve enclosure as
3.1.3.
Be careful with Humidity!!
cable knockout and if necessary,
3.1.4.
Do not cut or try to attach the connection cable.
Contact OMEGA Customer Service.
3.1.5. ON-OFF
outputs
as: no presence of sparks, faster commutation, noise practically un-existent, no presence of RF
interference and many more.
The outputs can commute any charge, since they are
250V / 1A
.
Electrical Power
must be
never
" at the equipment connection board.
cable knockouts
. It reduces impedance, generating measuring errors. Verify the
dry the connection block
Sensor Cable
are
thyristor
type
independent
from other system components.
are providing the proper sealing to the cable inlets.
IP-67.
using a hair dryer.
In case you need to change it
, offering innumerous advantages for the equipment, such
powered by alternate tension (VAC) imited to
s length,
RF Shield
Meas.
Yellow
Green
Electr. Shield
, l
Being
8

Advertisement

Table of Contents
loading

Table of Contents