Table Of Contents - Generac Power Systems RXUW200A3 Owner's Manual

Automatic transfer switch
Table of Contents

Advertisement

Introduction ..........................................................1
Read This Manual Thoroughly ....................................1
Safety Rules .........................................................1
Electrical Hazards ................................................2
General Hazards ..................................................3
Unpacking ............................................................5
Equipment Description .......................................5
Utility Service Circuit Breaker ......................................6
Transfer Switch Data Decal ................................6
Transfer Switch Enclosure .................................6
Safe Use of Transfer Switch ...............................6
Load Management Options .................................6
Smart A/C Module (SACM) .........................................6
Application Considerations ..........................................7
Accessories ..........................................................8
Introduction to Installation .................................9
Mounting ...............................................................9
Open Enclosure ...................................................9
Only) ....................................................................11
Connecting Start Circuit Wires .........................13
Connecting SACM .............................................13
Control of Air Conditioner Load .................................13
Auxiliary Contact ...............................................14
Fault Current Label ............................................14
(RBU Only) ..........................................................15
Automatic Transfer Switch Owner's Manual

Table of Contents

Functional Tests and Adjustments .................. 17
Manual Operation .............................................. 17
Close to Utility Source Side .......................................17
Close to Generator Source Side ...............................18
Return to Utility Source Side .....................................18
Voltage Checks .................................................. 18
Utility Voltage Checks ...............................................18
Generator Voltage Checks ........................................18
Generator Tests Under Load ............................ 18
Checking Automatic Operation ........................ 19
Installation Summary ........................................ 19
or During a Utility Outage ................................. 19
Preparing for Maintenance ............................... 20
Testing The SACM ............................................. 20
SACM Fuse Service ........................................... 20
Installation Drawings ........................................ 21
MAIN .........................................................................21
Interconnection Drawings ................................ 22
Generator ..................................................................22
Generator ..................................................................23
iii

Advertisement

Table of Contents
loading

Table of Contents