Goodman ComfortNet GCVC95 Series Installation Instructions Manual page 22

Two-stage gas furnace
Table of Contents

Advertisement

U
I
-T
PRIGHT
NSTALLATIONS
In a upright installation drain hoses are connected to drain ports on
the rubber elbow and the recuperator coil front cover. The drain lines
are then routed through the right side panel and into the drain trap
secured to the outside of the cabinet.
NOTE: Refer to Alternate Vent/Flue Hose Connections for upright
installations using an alternate vent/flue outlet.
1. Remove the rubber plug from the right side of the front cover
drain port.
2. Secure Hose A to front cover drain port with a red hose clamp.
Route hose to rear side panel grommet hole.
3. Cut and remove 1/4 inch from the end of the drain port on the
rubber elbow.
4. Insert Tube 1 into rubber elbow drain port and secure with
silver hose clamp. Angle tube outward toward front of furnace.
FRONT
COVER
DRAIN PORT
R
S
RAP ON
IGHT
IDE
RED HOSE
CLAMP
Upright "Standard" Connections - Right Side
(Upflow Shown, Counterflow Similar)
5. Cut 17 3/4 inches from the long end of Hose B and discard.
Secure the remaining hose to Tube 1 with a green hose
clamp. Route the other end of Hose B to front right side
panel grommet hole.
For details concerning mounting of the drain trap, refer to Horizontal
Drain Trap Mounting.
6. Insert short end of each of tube 2 through side panel grommet
holes. Secure tubes to hoses A and B with green hose
clamps. Ensure hoses and tubes maintain a downward slope
for proper drainage and that they are not kinked or binding.
HOSE
HOSE
GREEN
A
HOSE
CLAMPS
(3 PLACES)
22
RIGHT SIDE
PANEL
RUBBER
ELBOW
RUBBER ELBOW
DRAIN PORT
SILVER HOSE CLAMP
TUBE 1
SIDE PANEL
B
GROMMET
HOLES
TUBE(S) 2
DRAIN
TRAP

Advertisement

Table of Contents
loading

Table of Contents