International comfort products F9MVE Installation Instructions Manual page 19

Variable speed motor, two−stage 35” tall, high efficiency condensing
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Figure 13
Knockout Removal
CAUTION
!
CUT HAZARD
Failure to follow this caution may result in personal
injury.
Sheet metal parts may have sharp edges or burrs. Use
care and wear appropriate protective clothing, safety
glasses and gloves when handling parts, and servicing
furnaces.
Figure 14
Modify Rubber Drain Elbow
Cut line for left side condensate drain.
Do not discard parts after cutting.
440 01 4400 03
Figure 15
Formed end of
grommet
Factory supplied 1/2−in. CPVC to
3/4−in. PVC adapter
L12F019
Formed end of grommet
Open spring clamp. Insert
1/2−in. to 3/4−in. CPVC to
PVC adapter or 1/2−in.
CPVC pipe
Figure 16
1−3/8 in
(35 mm)
L11F089
Specifications subject to change without notice.
Gas Furnace: (F/G)9MVE
Drain Trap Connection and Routing
Attach elbow to condensate trap
Cut formed end off
condensate drain
elbow
Connect short end
of "Z" pipe to modified
drain elbow
TRAP, DRAIN ELBOW WITH DISCHARGE PIPE
Modified drain elbow connect to
condensate trap and "Z" pipe
LEFT SIDE DRAIN ROUTED BEHIND INDUCER
NOTE: Remove Inducer Housing for easier access, if desired.
Formed Rubber Drain Grommet
INSTALL CLAMPS ON DRAIN ELBOW
ATTACH DRAIN ELBOW TO CONDENSATE
DRAIN TRAP
PULL DRAIN STUB
THROUGH CASING
OPEN SPRING CLAMP
INSERT FACTORY−SUPPLIED 1/2−IN. CPVC
TO 3/4−IN. PVC ADAPTER OR 1/2−IN. CPVC PIPE
*CLAMP MAY BE LOCATED ON OUTSIDE OF DRAIN ELBOW
s
L12F015
L12F022
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents