Installation - Siemens LC98BE542 Instructions For Installation And Use Manual

Table of Contents

Advertisement

Installation

en
5Installation
Preparing the installation
I n s t a l l a t i o n
Caution!
Ensure that there are no electric wires, gas or water
pipes in the area where holes are to be made.
Mark a vertical centre line on the wall from the
1.
ceiling to the lower edge of the extractor hood.
Mark positions for the screws and the contour of the
2.
attachment area.
Drill five 8 mm diameter holes to a depth of 80 mm
3.
for the attachments and press in the wall plugs flush
with the wall.
14
Installation
Screw on the fixing bracket for the flue duct.
1.
Screw on brackets for the extractor hood hand-tight.
2.
Do not firmly tighten the screws.
Screw in the threaded bolt, leaving it protruding out
3.
of the wall by 5–9 mm.
¨
©
ª

Advertisement

Table of Contents
loading

Table of Contents