JVC GR-D30EK Service Manual page 177

Hide thumbs Also See for GR-D30EK:
Table of Contents

Advertisement

2.3.6.6.2
Installation (phase adjustment)
(1) Attach the loading motor assembly to the main deck.
(2) Secure the screw (a).
(3) Solder the wire to section (a).
(4) Arrange the wire along with the position guide (b).
(5) Attach the capstan brake assembly to the main deck.
(6) Place the main deck on the guide hole (a) of the control
plate.
(7) Place the main deck on the guide hole (b) of the drive lever.
(8) Place the main deck no guide hole (c) of the control cam to
install the control cam.
(9) Move the capstan brake in the direction shown by the ar-
row (a) to attach the press lever to the shaft (a). Make sure
that the boss of the press lever fits in the control cam, and
that the shaft (b) of the pinch roller arm assembly connects
with the hole of the press lever.
(10) Attach slit washer (a) to shaft (a).
Wire (red)
Position
guide (b)
Arrow (a)
DRIVE
LEVER
Guide hole (b)
Screw (a)
CONTROL CAM
PRESS LEVER
Fig.2-3-17
Wire (black)
Section (a)
Capstan brake assembly
CONTROL
PLATE
Shaft (a)
Guide hole (a)
Guide hole (c)
Loading motor assembly
Shaft (a)
Shaft (b)
Slit washer (a)
(No.86700)2-37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gr-d31ekGr-d30exGr-d30eyGr-d30ez

Table of Contents