American Standard S9V2B080D4VSAB Installer's Manual page 85

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2–stage condensing variable speed furnaces with variable speed draft inducer
Table of Contents

Advertisement

1.
Remove condensate drain plug from top right location on cold
header.
2.
Place condensate drain plug onto the cold header outlet located
on the bottom left of the cold header.
1.
Slide PVC through vent outlet adaptor and insert into inducer
outlet.
2.
Twist to insure PVC is fully inserted.
3.
Tighten the two clamps.
4.
Install the combustion air inlet PVC pipe.
Note: The vent outlet adapter is used for strain relief against the
weight of the venting. The clamp should be tightened after the
internal connection is made.
Note: If required, transition to larger venting within 2' of the cabinet.
CPL00938 – 2" x 3" offset coupling may be used and is factory
supplied with 120 MBTUH furnaces. Canadian applications may
use BAYREDUCE to meet ULC-S636 requirements.
18-CE03D1-1F-EN
F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
2
1
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents