LG UU12 Installation Manual page 28

Table of Contents

Advertisement

Wiring Connection
The power cord connected to the outdoor unit should be complied
with the following specifications (This equipment shall be
provided with a cord set complying with the national regulation.).
If the supply cord is damaged, it must be replaced by a special cord or assembly available from the manufacturer
or its service agent.
W
ARNING:
Make sure that the screws of the terminal are free from looseness.
28 Air Conditioner
Capacity
1 Phase
UU12/18/24/30
2.5mm
Capacity
3 Phase
UU37
1.5mm
CAUTION
The connecting cable connected to the indoor and
outdoor unit should be complied with the following
specifications (This equipment shall be provided with a
cord set complying with the national regulation.).
2
2
NORMAL
CROSS-SECTIONAL
2
AREA 0.75mm
(UU12/18/24/30/37)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uu18Uu24Uu30Uu37

Table of Contents