Wall-Vented Installation - LG LMV1625BQ Installation Instructions Manual

Hide thumbs Also See for LMV1625BQ:
Table of Contents

Advertisement

STEP 3:
PREPARE THE VENTING BLOWER

WALL-VENTED INSTALLATION:

1. Remove one blower unit mounting screw and one
blower plate screw. Remove the blower plate
from cabinet. See Figure 13.
2. Carefully lift the blower unit out of the microwave
oven.
3. Use side cutters or tin snips to cut and remove
knockouts "B" from Back plate. Discard
knockouts. Be careful not to distort the plate. See
Figure 14.
4. Reassemble the blower wire. See Figure 15.
5. Rotate the unit so that the exhaust ports face the
rear of the cabinet. See Figure 16. When you insert
blower unit, blower wire must be like figure 16.
6. Place blower unit back into cabinet. Check that
the exhaust ports face towards the rear of the
cabinet. See Figure 17.
7. Reattach the blower plate to cabinet so the
exhaust ports and blower plate opening are
aligned. Attach with one blower unit mounting
screw and then one blower plate mounting screw.
See Figure 18.
Figure 15
blower unit
Parts "B"
Parts "B"
— 11 —
back plate
blower plate
mounting screws
blower unit
mounting screw
Figure 13
Knockouts Parts "B"
Figure 14
blower
unit
exhaust
ports
Figure 16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lmv1625wLmv1625b

Table of Contents